In connection with the implementation of the Project IN1GB – 0038994 Photometallic and Mikoni: “Invest-Develop-Grow”, co-funded by the European Union under the INTERREG V-A Greece-Bulgaria 2014-2020 Cooperation Program, a public …
Project “Recovering SMEs by improving energy efficiency”
In September 2022, MIKONI Ltd. started the implementation of the Project No. BG16RFOP002-6.002-0563 “Recovering SMEs by improving energy efficiency” under the Operational Program “Innovations and Competitiveness” 2014-2020. The main objective …
MIKONI – Exhibitor at HANNOVER MESSE 2022
MIKONI was a part of the Bulgarian national participation at the International Exhibition for Industrial Technologies and Equipment HANNOVER MESSE 2022, which was held in the period 30 May – …
Project “Support for Small Enterprises with Turnover above 500 000 BGN to Overcome the Economic Impact of the COVID-19 Pandemic”
On 1-st November 2021, between MIKONI Ltd. and the Ministry of Economy was signed a Grant Contract BG16RFOP002-2.089-4357 for the implementation of the Project “Support for Small Enterprises with Turnover …
Modernization and Technological Renewal
In April, MIKONI launched in action a new professional flatbed cutting and formatting system SUMMA F1432, which is an innovative solution for the production of a wide variety of road …
New Automatic Powder Coating System
Since the beginning of the year, a new automatic powder coating system is operating in the MIKONI factory. The launching of the new powder coating line is a stage of …